| Intelagard Macaw Arrives at QBN
- Monday, January 25, 2010
at 16:14
|
First things first, read the instructions,then plug and check the fittings and cylinder (tested RFS 300 Bar cylinder). Added water and the foam provided, turned on the cylinder and walked out side and pulled the trigger.
Woooosh..... foam flying out the nozzle "bloody hell". Walked over to the QBN trailer, covered with foam 15 seconds. Over to the tanker bay doors, 3 bay doors and roof white in 1 minute. Wow still water left, quick 10m foam line with the wide spay nozzle. Still some water left so lets spray down the gum tree... Out of water.
where has this baby been for so long....? |
|
|
|